Admin · Configuration
Checklist builder
Versioned checklists by brand, outlet type and task type, with maker-checker approval · web builder in Release 2
Checklists
10 configured · Bengaluru
Version history
Lumio · Large-format electronics
Draft
Vivek Iyer · today 14:08
4 changes · effective Mon 19 Oct 2026
Live
Since Thu 1 Oct 2026
1,848 submitted
Retired
Wed 2 Sep – Wed 30 Sep 2026
1,702 submitted
Retired
Tue 4 Aug – Tue 1 Sep 2026
1,566 submitted
1,848
submitted on v3
98.1%
before check-out
3m 12s
average time
2.4%
sent back
Store readiness and sales
Lumio · Large-format electronics · 38 outlets
Fields · 12
10 required · 3 branches · drag to reorder
Add a fieldAppends to the end
- 1
Store readiness photo
Photo · Wide shot of the Lumio bay, lights on
Required - 2
Planogram photo
Photo · Front of the shelf, all facings visible
RequiredEvidenceRequired before check-out - 3
Demo units powered on
Toggle · Yes or no
Required - 4
Reason demo units are off
Shown when Demo units powered on is No
Required - 5
Note 12 units on shelf
Stepper · Limits 0 to 50
Required - 6
Display quality
Rating · 5-star scale
Required - 7
Photo of the display issue
Shown when Display quality at most 2 stars
Required - 8
Any POSM missing?
Toggle · Yes or no
Required - 9
Which POSM is missing?
Shown when Any POSM missing? is Yes
Required - 10
Competitor activity today
Dropdown · 4 choices · None seen, Vexa promoter on floor…
Optional - 11
Scan IMEI of each demo unit
Barcode scan · Checked against the Lumio product master
Required - 12
Demo confirmed by customer OTP
Customer OTP · OTP to the customer’s mobile; the number is not stored
Optional
Conditional rules
Branching runs on the phone, offline too
Rule 1 · branches to Which POSM is missing?
Condition met in the preview, so the field is showing
Rule 2 · branches to Photo of the display issue
Condition not met in the preview, so the field is hidden
Rule 3 · branches to Reason demo units are off
Condition not met in the preview, so the field is hidden
Live preview
v4 draft
Digital Bazaar · Store readiness and sales
Lumio checklist
1 required left · Scan IMEI of each demo unit
